Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяБыл более двух недель назад
Кандидат
Мужчина, 46 лет, родился 16 декабря 1978
Когалым, готов к переезду, готов к командировкам
Production Manager | Superintendent
Специализации:
- Менеджер продукта
- Руководитель проектов
Занятость: полная занятость
График работы: полный день, сменный график, вахтовый метод
Опыт работы 24 года 1 месяц
Декабрь 2014 — по настоящее время
10 лет 8 месяцев
LUKOIL MID-EAST LIMITED
Ирак, www.lukoil.com/Company/BusinessOperation/GeographicReach/Asia/LUKOILinIraq
Нефть и газ... Показать еще
Water Operations Superintendent
Treat Euphrates' river water and water intake facilities from main outfall drain/third River to supply water required at CPF. Efficiently manage subordinate operational staff and enable interaction of personnel with adjacent divisions of the field to complete work plan of the functional area.
Direct the Produced Water Treatment system to handle CPF aqueous wastes originating from MP, HP separators; well pads; oily & clean water and achieve the injection water quality specifications. Superintend water injection facilities to dispose produced water and maintain the reservoir pressure.
Mentor and educate local Middle Eastern staff with development programs encompassing introduction to “Ensure Safe Production” philosophy and improve operational procedures.
Recognized contribution and merit to the successful start-up of the West Qurna-2 Field Project in the Republic of Iraq. Achievement of Production Plateau of 400 kbopd – 2015 year.
Июль 2014 — Декабрь 2014
6 месяцев
LUKOIL MID-EAST LIMITED
Ирак, www.lukoil.com/Company/BusinessOperation/GeographicReach/Asia/LUKOILinIraq
Produced Water Treatment Supervisor
Supervised the operation and maintenance of water treatment at CPF aqueous wastes in compliance with the injection water quality specifications.
Gauged data and regulated treatment processes while recommending improvements and modifications.
Апрель 2013 — Июль 2014
1 год 4 месяца
LUKOIL MID-EAST LIMITED
Ирак, www.lukoil.com/Company/BusinessOperation/GeographicReach/Asia/LUKOILinIraq
Water Production and Injection Supervisor
Processed, monitored and controlled the treatment process while properly disposing produced water.
Oversaw the treatment of reservoir water to maintain optimal water quality and pressure.
Май 2007 — Март 2013
5 лет 11 месяцев
LUKOIL West Sibiria LLC
Когалым, www.lukoil.ru/
Field Production Manager
Managed large-scale oil & gas production field of 34 well pads, crude oil and produced water treatment process facilities, tank farm, high-pressure pump station and water injection facilities, oil-filling unit, low-pressure gas booster station and more than 100 km of oil gathering and high-pressure pipeline system. Steady production of 40 000 bopd at the liquid extraction of 285 000 blpd from more than 350 producer wells in the arctic conditions.
Established robust technological processes and various operations in accordance with approved project and regulations of labour protection, safety and environmental safety. Led commissioning procedures while implementing targets for volume of crude oil and gas production.
Assessed production and quality control operation to detect and correct problems in oil and gas production. Streamlined treatment and delivery of oil in the transportation system and treated reservoir water to maintain reservoir pressure, associated with gas burning and electricity generation.
Devised a long-range annual business plan and monitored the production budget to facilitate a culture of operational excellence, continuous improvement and optimum resource utilisation. Boosted staff performance in production operations with implementation of career development programs.
Май 2006 — Май 2007
1 год 1 месяц
LUKOIL West Sibiria LLC
Когалым, www.lukoil.ru/
Deputy Production Manager (Operations)
Organised timely inspections and tested equipment to conduct preventive maintenance, as well as upgrade existing equipment and technological systems to improve productivity and efficiency. Conducted root cause analysis of mishaps and developed preventive measures to eliminate violations of HSE Policy.
Facilitated integration of activities during simultaneous operation of departments such as drilling, construction and production while adhering to international standards ISO 31000, risk management principles, OHSAS 18001-2007, ISO 14001-2004, HSE management, civil defence and emergencies.
Administered the shutdown of equipment for the overhaul of new equipment and rendered impeccable support for continuous professional development of employees. Assured compliance with requirements in the field of industrial and environmental safety to reduce potential risks in industrial processes.
Updated logs of non-compliances with HSE (Operations HSE Action Tracking Register), submitted proposals for corrective actions in the production process to ensure safe production.
Март 2002 — Апрель 2006
4 года 2 месяца
LUKOIL West Sibiria LLC
Когалым, www.lukoil.ru/
Oil & Gas Production Technology Lead (Production field)
More than 350 production wells and more than 200 injection wells. Oil target - 4500 tons of crude oil per day. 10 Water supply wells.
Natural Flow and Artificial Lift:
Provided timely and quality execution of work through the organisation of effective interaction of structural units of the operator and contractors. Compiled proposals to reduce the number of well equipment failures, increase MTBF and overhaul life of down hole equipment.
ESP (Electrical Submersible Pump):
Selected ESP equipment for wells operation in line with the specifications for well operation.
Controlled and stabilised the production at the ESP operated wells associated with shut-down and bringing back into operation procedures by the established deadlines. Developed proposals to align equipment operating parameters with ESP specifications and hydrodynamic parameters of the wells.
Seamlessly coordinated contractors' activities aimed at preparation of ESP operated wells and drafted documents related to operation of wells and equipment. Scheduled anti-scaling, anti-corrosion and anti-deposits of asphalts, resins, and paraffin treatment of ESP operated wells.
Июль 2001 — Март 2002
9 месяцев
LUKOIL West Sibiria LLC
Когалым, www.lukoil.ru/
Water Production and Injection Supervisor
Processed, monitored and controlled the treatment process while properly disposing produced water.
Oversaw the treatment of reservoir water to maintain optimal water quality and pressure.
Навыки
Уровни владения навыками
Обо мне
Motivated and results-focused professional with 19 years of extensive experience in Oil & Gas Field Production of multibillion projects. Expert in identifying, diagnosing and resolving operational, manufacturing and maintenance problems within deadlines in largescale operations. Proven track record of achieving sustained improvements in quality, cost and delivery functions by implementing lean operating methods. Demonstrated ability to catalyse results, while complying with budget and time constraints.
Высшее образование
2001
Institute of Geology and Oil and Gas Production, Machinery and Equipment for Oil and Gas Fields
Знание языков
Повышение квалификации, курсы
2004
Technical managing of mining operations for oil & wells workover
Ufa State Oil & Gas University, Wells operations. Reservoir maintenance.
Тесты, экзамены
2013
CEF, Common European Framework, Cambridge
EF Education, English language
Гражданство, время в пути до работы
Гражданство: Россия
Разрешение на работу: Ирак, Россия
Желательное время в пути до работы: Не имеет значения